Sarasota News Leader

10/25/2013

Issue link: https://newsleader.uberflip.com/i/198837

Contents of this Issue

Navigation

Page 71 of 130

Sarasota News Leader October 25, 2013 Page 72 at some places under the stadium" when it material provided to the board contained only a review of the Tourist Development Tax rains, he added. revenue allocated to the stadium's renovaThe expense for those repairs should be about tion and maintenance. Referring to the latter, $21,000, he said. Robinson said, "Picking through it was a little Referencing the preliminary facilities difficult." assessment that has been prepared by TLC Engineering for Architecture — the Orlando firm the county hired to undertake the study — the lighting system replacement is the top priority, Calhoon pointed out. "My concern, especially in the out years [is that] the income is really exceeding the original expectations," Commissioner Nora Patterson said, "and I'm optimistic enough to think that that will continue." County staff will be meeting with representa- She added, "It's really not reasonable to tives of the Orioles within the next week to expect that those monies — absent an extension of the contract with the Orioles — will finalize that report, he added. be used a piece at a time basically to rebuild THE BIGGER PICTURE the stadium again over the 30-year period [of the MOU]." After Calhoon completed his presentation, Commissioner Christine Robinson pointed out Patterson pointed out that she was interested that she had requested a complete history of in the prospect of the county using some of the CAPX fund. However, the back-up agenda that extra revenue for other purposes. Pat Calhoon provides details about the Ed Smith lighting project during the Oct. 23 County Commission meeting. Photo by Norman Schimmel

Articles in this issue

Archives of this issue

view archives of Sarasota News Leader - 10/25/2013