Sarasota News Leader

01/24/2014

Issue link: https://newsleader.uberflip.com/i/247585

Contents of this Issue

Navigation

Page 39 of 128

Sarasota News Leader January 24, 2014 Snyder asked how the latter could be done. "We can lower the current floor [which is now about 25 feet below the surface], or build something contiguous [using some of the same walls], or go adjacent and put in a new one," said Garland. Page 40 That question will not have a final answer until McKim & Creed is authorized to begin the design phase. The company, in a small way, is already in Phase 2, which will require environmental permitting. Because of the usual delay in getting permits from the Florida Department of Environmental Protection, the A map shows the location of Pomelo Avenue and Alta Vista Street in Sarasota. Image from Google Maps

Articles in this issue

Archives of this issue

view archives of Sarasota News Leader - 01/24/2014