Sarasota News Leader
January 24, 2014
Snyder asked how the latter could be done.
"We can lower the current floor [which is
now about 25 feet below the surface], or build
something contiguous [using some of the
same walls], or go adjacent and put in a new
one," said Garland.
Page 40
That question will not have a final answer
until McKim & Creed is authorized to begin
the design phase. The company, in a small
way, is already in Phase 2, which will require
environmental permitting. Because of the
usual delay in getting permits from the Florida
Department of Environmental Protection, the
A map shows the location of Pomelo Avenue and Alta Vista Street in Sarasota. Image from Google Maps