Sarasota News Leader

02/28/2014

Issue link: https://newsleader.uberflip.com/i/268408

Contents of this Issue

Navigation

Page 106 of 127

Siesta Seen • Alternate No. 3: Ten additional "two pole" shelters. The term "two pole" refers to the Parks and Recreation Department's typical small wooden design in which a roof struc- ture is held up with two vertical columns, he noted. These structures are usually about 12 feet square — "big enough for one picnic table." Gaubatz added, "The design for the Siesta Beach Improvements project will be a bit dif- ferent and will match the project architecture. These won't be installed until later this year." • Alternate No. 4: Tree size upgrade. This alternate increases the size of 64 Green Buttonwoods within the general area where the east concessions will be located. Instead of 10-foot-tall trees, 20-foot-tall trees will be planted, "providing more shade right off the bat," he wrote. Further, part of Alternate No. 5 has been added back in, Gaubatz wrote. "This alternate was to change all of the concrete sidewalks to standard brick pavers," he pointed out. "At this time, we are just changing the pavers in the main esplanade along the parking lot. We couldn't pick up the full alternate at this time." The esplanade will provide pedestrians, bicy- clists and even rollerbladers a pathway from one end of the park to the other without hav- ing to contend with parking lot traffic. An artist's rendering shows the view people will have of the east concession area at Siesta Public Beach once the improvements project is complete. Image courtesy Sarasota County Sarasota News Leader February 28, 2014 Page 107

Articles in this issue

Archives of this issue

view archives of Sarasota News Leader - 02/28/2014